中
|
EN
About us
The origination of the website
Website management and preservation unit
Contact us
Land subsidence
Approach for detection
Influences
Past area
Hydrogeology
Land subsidence in the world
Effects for detection
Land subsidence area
Prevention and reclamation strategies
Strategies
Works
Effects
Download research projects
Groundwater’s regulation and controlling area
Regulation of groundwater
Key points for assignment
Relevant laws
Management in the world
Guidelines for detection
Results and descriptions
Knowledge corner
Pumping wells
Methods of measuring pumping quantities
Pumping well management
Learning
News
Knowledges
Disaster
Download learning materials.
Informations
Members
Links
Discussion area
Website map
Links
|
Members
|
Discussion area
|
Website map
中
|
EN
|
Log in
|
Enrollment
About us
The origination of the website
Website management and preservation unit
Contact us
Land subsidence
Approach for detection
Influences
Past area
Hydrogeology
Land subsidence in the world
Effects for detection
Prevention and reclamation strategies
Strategies
Works
Effects
Download research projects
Groundwater’s regulation and controlling area
Regulation of groundwater
Key points for assignment
Relevant laws
Management in the world
Guidelines for detection
Results and descriptions
Knowledge corner
Pumping wells
Methods of measuring pumping quantities
Pumping well management
Learning
News
Knowledges
Disaster
Download learning materials.
Informations
Prevention and reclamation strategies
Home
Prevention and reclamation strategies
Strategies
Implementation Plan for Closure and Relocation of Publicly-owned and Legal Water Wells within a 3km Wide Range along the High-speed Railway in Yunlin County (Approved in 2005)
Strategies
Changhua County Public Legal Water Well Closure Plan (approved in 2006)
Strategies
Changhua Yunlin area stratum subsidence prevention plan (approved in 2005)
Strategies
The second phase of the implementation plan for the prevention and control of stratum subsidence approved in 2003)
Strategies
The first phase of the implementation plan for the prevention and control of stratum subsidence (approved in 1995)
1
2